RFIs resolved before the concrete truck arrives
Superintendent submits the RFI with a photo from the field. PM and architect receive push notifications within seconds. The full exchange — question, drawing markup or ASI, response, resolution — is logged and timestamped. Average resolution time on active BuildVyne projects: under 4 hours (based on BuildVyne project data, 2023–2025).
When your pour schedule depends on a structural drawing clarification, that's the difference between a productive day and a mobilization cost plus a schedule cascade.
BuildVyne does not replace Procore for submittal tracking or document management, and does not handle estimating or bidding. It handles what happens after you break ground: field communication, daily documentation, and closeout.
- Submit RFIs from iOS or Android in under 2 minutes
- Instant notification to PM, architect, or engineer of record
- ASI and drawing markup attached to originating RFI
- Full timestamped audit trail — every exchange documented